Design assessments

Tape-out readiness review.

The last gate before the masks are ordered. We check the design and its evidence against a tape-out checklist, as a team that prepares mask data and manages the hand-off to the foundry.

For
Teams within reach of tape-out, and their boards and investors
You provide
Sign-off reports, verification results, test plan, IP list and package drawings
You receive
A readiness report with a clear recommendation: release, or the items to close first
Next step
GDS-in tape-out and production

What we check

One list, every discipline.

  1. Function

    Verification closed to plan, with open issues listed and accepted.

  2. Timing and power

    Sign-off across corners and modes; IR drop and electromigration.

  3. Physical

    DRC, LVS, antenna and density clean, or waived by name.

  4. Test

    Scan, memory BIST and ATPG coverage, and the plan for the test program.

  5. IP and libraries

    Versions, licences and foundry approvals for every block.

  6. Package and board

    Pad ring, bump or bond map and package drawings agreed.

  7. Foundry hand-off

    Mask data preparation and the documents the foundry requires.

What you receive

A readiness report.

  1. The checklist

    The status and the evidence of every item.

  2. Items to close

    What to close before release, in order.

  3. Risks accepted

    Each one written down.

  4. The next stage

    A proposed scope for tape-out and production support.

Questions about tape-out readiness

When should a readiness review start?

Early enough to act on it: once verification and layout are near completion, and before the tape-out date is fixed by anything other than the data.

Who should run it?

People outside the team that built the design. A fresh reading finds what familiarity hides.

A multi-project wafer or a full mask set for the first run?

A multi-project wafer proves a design at a fraction of the cost; a full mask set gives the product wafers of its own. Our own 16 nm work went both ways.

Can you take the design to tape-out afterwards?

Yes. In a GDS-in engagement you hand over signed-off layout, and we tape it out and run production.

Tape-out date in sight?

Send the sign-off reports and verification results.

  1. Fill in the project form
  2. We reply by email within a few working days
  3. Onboarding: NDA, design review and a staged plan

The form is the fastest way to reach us. A person reads every request.