Design assessments
Production transfer assessment.
An existing chip can move to us for production management. Before it does, we review what the move involves: wafers, test, packaging and delivery.
- For
- Companies with a chip in production who want a second route to supply or a new production manager
- You provide
- Test programs, package drawings and yield history
- You receive
- A written transfer assessment
- Partners
- Packaging and test in Taiwan, Dongguan and elsewhere in mainland China
What we review
Everything a transfer touches.
Wafer supply
The process, the mask set and the terms on which wafers can be ordered.
Test
Wafer probe and final test programs, their coverage and their test time.
Package
Drawings, materials and the assembly flow.
Yield
History by lot, the main sources of loss and what can be recovered.
Quality and records
Screening, traceability and the records each handover needs.
Logistics
Stock, lead times and delivery to your schedule.
What you receive
A written transfer assessment.
A transfer plan
Step by step.
Gaps in the data package
What to fill in the present data package.
Risks
To yield, cost and continuity of supply.
The next stage
A proposed scope and quotation for production management.
Questions about production transfer
What do you need to assess a transfer?
The test programs, package drawings and yields so far.
Do the masks have to be remade?
Not if production stays on the same process and the mask set can be used under the new arrangement. The assessment confirms this first, because it decides the cost of the move.
Can you manage production after the move?
Yes. We plan and manage production and supply, from wafers through test and assembly to delivery.
Related pages
Planning to move a chip's production?
Tell us the process, the package and the yields so far.
- Fill in the project form
- We reply by email within a few working days
- Onboarding: NDA, design review and a staged plan
The form is the fastest way to reach us. A person reads every request.