Paths to a chip

From your RTL to signed-off GDSII.

You own the RTL; we take it through synthesis, test insertion, physical design and sign-off, and on to tape-out if you want it. One team, one schedule.

For
Teams with RTL and no back-end team, or with one that is fully booked
You provide
RTL, constraints, the verification environment, and the memory and I/O lists
You receive
Signed-off GDSII and test programs
Process experience
TSMC direct account; design work on FinFET nodes at 16 nm, 12 nm, 7 nm and 6 nm

What we do

The back half of the flow, stage by stage.

  1. RTL hand-off

    Your RTL is reviewed against a hand-off checklist before we take ownership.

  2. Synthesis and constraints

    A netlist that meets timing, with constraints agreed and every exception justified.

  3. Design for test

    Scan, memory BIST and ATPG, so every die can be screened in production.

  4. Floorplan and power

    Macros, power grid and pad ring planned around the design.

  5. Place and route, and the clock tree

    Placement, clock tree and routing, with full-custom blocks where standard cells fall short.

  6. Sign-off

    Timing, power integrity and physical verification closed across corners and modes.

  7. Tape-out

    Mask data preparation and the hand-off to the foundry.

How a project runs

Four gates, each signed off before the next begins.

  1. RTL hand-off

    Function complete and verified to plan.

  2. Netlist sign-off

    Synthesis, DFT insertion and equivalence closed.

  3. Layout sign-off

    Timing, power and physical checks clean.

  4. Tape-out

    Mask data released to the foundry.

Questions about RTL to GDSII

What do you need from us to start?

RTL that is functionally complete, its constraints and verification environment, and the list of memories, IP and I/O. An RTL assessment first shows what is ready and what still needs work.

Can you start before the RTL is frozen?

Yes. Trial synthesis and floorplanning on early RTL show timing and area risks while they are still cheap to fix.

Can you verify the design as well?

Yes. Verification is one of the stages we take on, or it can stay with your team.

Can you deliver GDSII only, so that we tape out ourselves?

Yes. We deliver signed-off GDSII for you to build on your own foundry account, or we carry on through tape-out and production. We have delivered compute-accelerator ASICs to customers this way.

How is our design protected?

Every project runs under a mutual NDA, with access limited to the named project team; ownership of the design and its data is set in each project's contract.

RTL ready, and no back end?

Tell us the design size, the target process and your tape-out date.

  1. Fill in the project form
  2. We reply by email within a few working days
  3. Onboarding: NDA, design review and a staged plan

The form is the fastest way to reach us. A person reads every request.