Buyer's guide · Commissioning a mining chip

What to ask for when you commission a mining chip

A mining chip is judged by its figures at the die, and by what they become in the machine built on it. These checks set out the chip-level figures to ask for, the deliverables, how engineering is quoted and what our partners do for the machine: for each, what good looks like and what we provide.

The short answer

What should you ask for when you commission a mining chip?

Chip-level figures with their basis: hash rate per die, energy per hash at chip level and how it relates to the wall, the core voltage behind each figure, and the grades the dies will be binned into. Then the deliverables at each stage, engineering quoted apart from hardware, ownership of the design, and a clear split of what the partners do for the machine.

Chip figures
Our own chip-level measurements, or the specifications of our designs, each with its basis
Grades
Dies tested and binned into grades, each grade in its own miner model
Deliverables
GDS, or tested and binned chips, and a hashboard design, as the contract sets
Engineering
Quoted apart from wafers, packaging, test and finished units

The checklist

Eight checks, and what good looks like

The checkWhat we provideWhat good looks like
Hash rate per chipAn estimate with its basis before silicon, then hash rate per die measured across voltage: on our 16 nm production silicon, up to 189 GH/s per die at 0.48 V.Hash rate per die at a stated core voltage and clock, with the pipeline and the number of cores behind it.
J/TH at chip level and at the wallChip-level energy per hash with its basis, such as 58.7 J/TH with ASICBoost on our 16 nm first silicon; for the machine, the whole miner tuned and measured at the socket.J/TH stated at chip level and at the wall, at a stated voltage and temperature, and the gap between them explained: the power supply's conversion, the fans and the control board.
Core voltageThe core voltage behind every figure, on cell libraries re-characterised for near-threshold voltage: our 16 nm production silicon hashes at a core voltage as low as 0.38 V.The lowest stable core voltage and the voltage of each operating point, since energy per hash falls with the voltage.
Bins and gradesDies tested and binned into grades by our method for test and binning of many-core chips, the subject of our patent, each grade built into its own miner model.The grades defined before production: the hash rate and core voltage of each, so that machines of one model perform alike.
DeliverablesWhat the contract sets: GDS for your foundry, or the chip carried on through wafers, packaging, test and binning to tested chips, and a hashboard design with the firmware that brings the chip up.A written list of what is handed over at each stage, and in what form: GDS, test program, wafers, tested chips, board design.
Engineering apart from hardwareDesign engineering quoted apart from wafers, packaging, test and finished units.Engineering paid once, by stage, and hardware priced per unit, so each can be checked on its own.
Design ownershipEvery project under a mutual NDA, with access limited to the named project team; ownership of the design and its data set in the contract.Ownership of the design and its data written into the contract before the work starts.
What the partners do for the machineThe chip, the hashboard and the firmware are our design; power supplies and control boards are co-developed with specialist partners, who build them, and the machines are built with our EMS partners.A clear answer to who designs and who builds each part of the machine: the chip, the hashboard, the control board, the power supply and the final assembly.

The checks in detail

Why each one matters

  1. The die and the wall

    Chip-level J/TH leaves out the power supply's conversion, the fans and the control board. Ask for the chip figure with its conditions, and for how the machine built on it will be measured at the socket.

  2. A figure needs its voltage

    Energy per hash falls as the core voltage drops, so a figure without its voltage and clock says little. Ask for both at every operating point.

  3. Grades agreed early

    Dies from one wafer differ, and binning sorts them into grades. Grades agreed before production let each machine model be built from chips that suit its settings.

  4. Deliverables in writing

    A design delivered as GDS and a chip carried on through supply to tested parts are different scopes. A written list of what is delivered at each stage keeps both sides to one plan.

  5. Engineering apart from hardware

    Engineering is paid once and hardware per unit. Quoted apart, each can be compared with other offers on its own.

  6. The machine around the chip

    The hashboard sets each chip's voltage and clock, and the power supply and cooling decide how hard the chips can run. Our hashboards and firmware are our own design, and our partners develop and build the rest.

Questions customers ask

What is the difference between chip-level and wall efficiency?

Chip-level efficiency is the energy per unit of hash rate of the chips alone. At the wall it includes the power supply, the fans and the control board: the figure the machine is run at.

Which chip figures should a proposal state?

Hash rate per die, energy per hash at chip level, the core voltage and clock behind each, and the grades the dies will be binned into, each with its basis. Our figures are our own chip-level measurements or the specifications of our designs.

What do you deliver?

What the contract sets: GDS for your foundry, or the chip carried on through wafers, packaging, test and binning to tested chips, and a hashboard design with the firmware that brings the chip up.

Is engineering quoted apart from hardware?

Yes. Design engineering is quoted apart from wafers, packaging, test and finished units.

Who builds the machines?

Our partners. Power supplies and control boards are co-developed with specialist partners, who build them, and machines on our designs are built with our EMS partners in Shenzhen, Vietnam and the Chicago area.

Who owns the design?

Each project runs under a mutual NDA, and ownership of the design and its data is set in the project's contract.

What are the payment terms?

Agreed per contract.

Commission your mining chip with the checks answered

Tell us the algorithm, the efficiency you need and the volume. We will answer each check in our proposal.

Our figures are our own chip-level measurements or the specifications of our designs. This page is general guidance.